
From the initial setup of the ship, everything is carefully covered. The Student
is shown how to set up the splines that will eventually form the keel, which is
then surfaced up. The keel is split into a top and bottom segment so that the top
can have deck holes for draining water added, then the deck is laid. The deck is
then refined to its three main heights and deck houses are added followed by
additional detail and yardarms, belaying pins, rope hooks and so forth.
Andy has recorded all of the time spent in Blender: over 40 hours of modeling,
shading, lighting, animation, rendering and compositing. These recordings have
been selectively sped up, edited and enriched with a detailed commentary, resulting
in a riveting 6 hour documentation of the creation of a cinematic movie scene.
http://www.3d-palace.com/index.php?page=cutty_shop

Download File Size:11.23 GB